| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Hanley Baseball Complex Phase 1 12/15/22 2pm This project consists of removal of existing culverts, trenching and excavation, sewer line with lat... | 12/15/2022 | ||
| ACE Charter School Demo & Abate 12/21/22 2pm Cottage Grove. Or. Pre-Bid: Mandatory 12/7 2pm at the main entrance of ACE Charter School located at... | 12/07/2022 | 12/21/2022 | |
| Richardson Hall Chiller & Controls CM/GC 1/5/23 2pm Corvallis, Or. Pre-Bid: Mandatory 11/30 10:30am Richardson Hall Room 107, 3180 SW Jefferson Way, Cor... | 11/30/2022 | 01/05/2023 | |
| M St. 7th to 9th Sewer Rehab. 12/15/22 3pm Installation of approximately 20 lineal feet of 12″ PVC sanitary sewer main and associated app... | 12/08/2022 | 12/15/2022 | |
| OSU Cascades Master Architect 12/13/22 2pm The MA will support the campus in a number of short term and longterm efforts that will help shape t... | 11/28/2022 | 12/13/2022 | |
| Crowley Property Development 1/9/23 4pm Eureka, Ca. Pre-Bid: Non-Mandatory 12/1 2pm at the Crowley Property on Hilfiker Lane. Contact: Gabri... | 12/01/2022 | 01/09/2023 | |
| Small Lot Vegetation Management Rebid 1/11/23 2pm Lane Co. Or. Pre-Bid: Appointments to attend a site visit will be coordinated through Tim Rogers at ... | 01/11/2023 | ||
| Wastewater Collection & Storm Drain Project 12/6/22 2pm Cleaning of pipes, mainline video inspection, install cured in-place lining, internal service reinst... | 12/06/2022 | ||
| J-Lateral Piping Project 12/8/22 2pm Furnishing, welding and installation of approximately 8,400 LF of HDPE Solid-Wall pipe ranging in di... | 12/01/2022 | 12/08/2022 | |
| Manufacture & Delivery Aluminum Docks 12/8/22 3pm Material and labor to fabricate and deliver aluminum boarding dock structures to the Port of Bandon. | 12/08/2022 | ||
| Title | Site Walk Through | Deadline |